High school redesign - flex time
| dc.contributor.author | Rowan, Jackie | |
| dc.contributor.supervisor | Milford, Todd | |
| dc.date.accessioned | 2015-04-30T19:20:21Z | |
| dc.date.available | 2015-04-30T19:20:21Z | |
| dc.date.copyright | 2015 | en_US |
| dc.date.issued | 2015-04-30 | |
| dc.degree.department | Department of Curriculum and Instruction | |
| dc.degree.level | Master of Education M.Ed. | en_US |
| dc.description.abstract | This project is a proposal for the implementation of high school redesign initiatives at Salisbury Composite High School in Sherwood Park. This proposal includes a recommendation to adopt the flex block on a weekly basis at Salisbury Composite high school for a duration of forty minutes, and progress to offering course groupings and teacher advisory groups in the coming school year. This proposal was created in an effort to align the school goals with the mandate from Alberta Education (2010) to move towards an educational environment to support the 3 E's (Engaged student, Ethical citizen, Entrepreneurial Spirit). | en_US |
| dc.description.scholarlevel | Graduate | en_US |
| dc.identifier.uri | http://hdl.handle.net/1828/6086 | |
| dc.language.iso | en | en_US |
| dc.rights | Available to the World Wide Web | en_US |
| dc.subject | High School Redesign | |
| dc.subject | Flex Time | |
| dc.subject | Alberta Education initiatives | |
| dc.title | High school redesign - flex time | en_US |
| dc.type | project | en_US |